| Show 1 to 20 (of in total 303 products) | Sites: 1 2 3 4 5 ... [next >>] |
Taucherflagge AlphaTaucherflagge Alpha from 10,50 EUR ( 19 % VAT incl. excl. Shipping costs ) Shipping time: 3-6 Days |
foot with a diameter of 171 mmfrom 8,95 EUR ( 19 % VAT incl. excl. Shipping costs ) Shipping time: 3-6 Days |
doublepack 7L 232 Bar normal air with manifold 186mmdoublepack 7L 232 Bar normal air with closable manifold 186mm tank distance from 429,90 EUR ( 19 % VAT incl. excl. Shipping costs ) Shipping time: 3-6 Days |
steel tank 1Liter for all gasessteel tank 1 Liter for all gases from 76,50 EUR ( 19 % VAT incl. excl. Shipping costs ) Shipping time: 3-6 Days |
thread saving plug for DIN 5/8" valves for normal airfrom 10,35 EUR ( 19 % VAT incl. excl. Shipping costs ) Shipping time: 3-6 Days |
PTG 20l complete 200 Bartank 20 Liter, complete 200 Bar pressure from 232,20 EUR ( 19 % VAT incl. excl. Shipping costs ) Shipping time: advance order |
Taucherflagge DANTaucherflagge DAN -Flagge rot/weiß from 9,50 EUR ( 19 % VAT incl. excl. Shipping costs ) Shipping time: 3-6 Days |
tee (HD)tee for high air pressures: first for normal air (extended valve), second for normal air (intended valve) from 32,47 EUR ( 19 % VAT incl. excl. Shipping costs ) Shipping time: 3-6 Days |
PTG 10l complete 300 Bar 171mmTauchflasche 10 Liter, komplett 300 Bar Druckluft from 206,54 EUR ( 19 % VAT incl. excl. Shipping costs ) Shipping time: 4-5 weeks |
adapter oxygen female - air femalefilling and removing adapter for oxygen / air; to fill nitrox tanks with oxygen valve. from 20,68 EUR ( 19 % VAT incl. excl. Shipping costs ) Shipping time: 3-6 Days |
PTG 8l complete 232 Barfrom 170,10 EUR ( 19 % VAT incl. excl. Shipping costs ) Shipping time: advance order |
steel bands 171mm, tank distance 185mmsteel tank 171mm, tank distance 185mm from 34,11 EUR ( 19 % VAT incl. excl. Shipping costs ) Shipping time: 3-6 Days |
steel bands 204mm, distance 215steel bands for double packs 204mm, tank distance 215mm from 35,55 EUR ( 19 % VAT incl. excl. Shipping costs ) Shipping time: 3-6 Days |
double pack 12L, tank diameter 171mm, tank distance 185mmdouble pack 12L, tank diameter 171mm, distance between tanks 185mm from 428,72 EUR ( 19 % VAT incl. excl. Shipping costs ) Shipping time: 3-6 Days |
steel tank 50L compessed air 200 bar50 Liter tank for oxygen or normal air for reservating. from 326,60 EUR ( 19 % VAT incl. excl. Shipping costs ) Shipping time: 3-6 Days |
Aktivkohle Carbotec C 40/1 im 1 Liter EimerAktivkohle Carbotec C 40/1 im 1 Liter Eimer from 10,58 EUR ( 19 % VAT incl. excl. Shipping costs ) Shipping time: 3-6 Days |
Adapter Air (5/8") -- inert gas (W21.8) inside / insideAdapter Air (5/8") -- inert gas (W21.8) inside / inside from 20,68 EUR ( 19 % VAT incl. excl. Shipping costs ) Shipping time: 3-6 Days |
Adapter oxygen - normal air e.-e.Adapter for oxygen to normal air, extanded threads from 20,68 EUR ( 19 % VAT incl. excl. Shipping costs ) Shipping time: 3-6 Days |
Adapter oxygen - inert gas extended - intendedAdapter oxygen - inert gas extended/intended thread from 20,68 EUR ( 19 % VAT incl. excl. Shipping costs ) Shipping time: 3-6 Days |
Adapter M26x2 e.-5/8"i. (Nitrox - normal air)adapter for input and output for nitrox valves M26x2 to normal air from 20,68 EUR ( 19 % VAT incl. excl. Shipping costs ) Shipping time: 3-6 Days |
| Show 1 to 20 (of in total 303 products) | Sites: 1 2 3 4 5 ... [next >>] |

